For construction companies

Unstructured in.
Answers out.

Construction intelligence from drawings, specs, addenda, and spreadsheets — cited, reviewable, and ready from bid day to build day.

Human review built in. Your data does not train our models.

Your team is the API between unstructured documents

Four-hundred-sheet sets. Friday-afternoon addenda. Field spreadsheets that disagree with the estimate. Estimators, PMs, and ops leads spend their best hours stitching systems together by hand.

Estimator

Bid day is a document chase

Missing sheets, conflicting specs, and last-minute addenda hide in the set until someone has already priced the wrong scope.

Project manager

Revisions break assumptions

A revision lands. Quantities shift. Nobody knows which assumptions still hold — or what the change order should cover.

Ops lead

Forecasts live in spreadsheets

Hours, progress, and delivery status sit in different tools. The forecast is whatever someone typed last Tuesday.

From bid day to build day

Win the work with cited takeoff intelligence. Plan and build with forecasts grounded in your own actuals. Every card below is honest about status — Available now means shipped; Early access means proven on your data in a pilot.

Win the work

Bid-side intelligence over drawing sets, specs, and addenda

Available now

Ask the Set

Natural-language Q&A over drawings, specs, and project records. Every claim carries a citation. No uncited answers.

Available now

Takeoff Intelligence

AI quantity extraction from PDF drawing sets, with evidence you can inspect — not a black-box total.

Available now

Revision & Addenda Delta

Quantity deltas by trade and unit. Addenda register. Assumption ledgers that break when the set changes.

Available now

Bid-Day Briefs

Day-zero project briefs, trade briefs, and bid-completeness checks — so you know what is still open before you price.

Available now

Spec Reconcile

Spec-versus-drawing conflict lists with citations. Clean “no conflict” when the set agrees — also cited.

Available now

Handoff Packs

Estimate-basis exports with quantities, sheet numbers, revisions, and assumptions. Writeback to your estimating system is opt-in and review-gated.

Plan and build

Forecasting and predictive planning from your operational data

Early access

Hours Forecasting

Stage timers tied to work-item complexity become your productivity baselines. Forecast the next project from your actuals — not industry factors.

Early access

Schedule Risk

Priority groups, progress, and deficiency rates surface which work slips next — and what it blocks — in shop or field.

Early access

Change Order Radar

Revision deltas and assumption ledgers flag and quantify owner-change impacts while you still have pricing leverage.

Early access

Rework & QC Trends

Deficiency summaries by category highlight rework hotspots before they consume the schedule.

Available now

Delivery & Material Visibility

“Where are my materials?” answered with shipment proof and stage evidence — not a status rumor.

Available now

Progress & Forecast-at-Completion

Portfolio percent-complete by phase with forecast rollups your ops team can trust and challenge.

On the roadmap — not promised on this page

  • Workforce planning
  • Chat with schedule
  • Cash-flow / WIP forecasting
  • Photo progress capture

Drop the set. Review the evidence. Decide.

A three-step loop designed for people who already own the judgment call.

Drop your set

Upload drawing-set PDFs, specs, addenda, and supporting spreadsheets into a private project vault.

Extraction with evidence

Sheets are indexed, quantities extracted, revisions paired. Every finding points back to a source you can open.

Ask, review, export

Ask questions, work the review queue, export handoff packs. Humans approve. Nothing writes to your systems without review.

The engineering stance is the product

Construction buyers have been burned by vaporware. We sell what we will stand behind on a live project.

Cited evidence required

Answers without citations are rejected. If we cannot show the sheet, the claim does not ship.

Suggest-only

Recommendations for humans to accept or reject. The product never pretends to be the decision-maker.

Writeback on your terms

Read-only by default. If you want updates pushed to your ERP, estimating, or project management system, it is opt-in per client — and every write passes a manual review gate first.

Your data stays yours

Private by default. Self-hosted inference available so drawings and specs never leave your control.

Built inside a working construction operations platform

Battle-tested with industrial contractors on live projects — not a demo trained on stock PDFs. The same cited-evidence loop that estimators and ops teams use every week.

Four modules. One paid pilot.

Start where the pain is. Expand when the pilot earns it.

Module 01

Takeoff Intelligence

PDF set ingestion, quantities with evidence, revision deltas, bid briefs, and handoff packs.

Module 02

Project Q&A + Vault

Private document library and cited natural-language answers over drawings, specs, and project records.

Module 03

Forecasting & Planning

Hours forecasts, schedule risk, QC trends, delivery visibility, and forecast-at-completion.

Module 04

BIM Workflow

Work-item tracking, stage timers, and modeling workflow support that sits beside your existing BIM tools.

4-week paid pilot

Fixed fee. Your live project. Success measured in hours saved, revision catch rate, and forecast accuracy — not slideware.

Book a pilot call

Straight answers

The questions every construction buyer asks before they share a drawing set.

Does our data train your models?

No. Customer drawings, specs, and project data are not used to train shared models. Your projects stay yours.

Where does it run?

Private by default. Self-hosted inference is available when drawings and specs must never leave your network.

What formats do you support?

PDF drawing sets, specifications, addenda, and common spreadsheet formats used for estimates and field status.

What does the pilot look like?

Four weeks, fixed fee, on a live project you choose. We measure hours saved, revision catch rate, and forecast usefulness — then decide together whether to continue.

Will it write to our systems?

Only if you turn that on. By default we export handoff packs and write nothing. Writeback to your ERP or estimating system is enabled per client, and every write passes a manual review gate before it posts.

Get the sample Day-0 Project Brief

A trade-neutral example of what estimators see on day zero: discipline counts, missing sheets, open questions, and self-perform vs. sub hints — generated from a public drawing set. No sales call required.

We use your email only to send the brief and follow up if you ask. No drip campaigns.